How Much Does a Bathroom Renovation Cost?

Written by James Walker · Last reviewed 15 August 2026

James Walker has 2 degrees in construction (BSc (Hons) Building Surveying · MSc Environmental Design of Buildings) and an extensive background in issue resolution, resolving over £4 billion of consumer issues.

The short answer

  • A standard full refit typically costs £5,000–£10,000.
  • A cosmetic refresh is £3,000–£5,000; reconfiguring the layout takes it to £12,000–£26,000.
  • Labour is usually the larger share, not the suite.
  • Moving the soil pipe is the single biggest cost jump in most bathrooms.
  • Prices last updated August 2026.
On this page

Cost by scope

ScopeTypical rangeMid-point
Cloakroom or cosmetic refresh£3,000–£5,000
Full like-for-like refit£5,000–£10,000£7,500
Premium refit or wet room£10,000–£20,000
Reconfiguration into adjacent space£12,000–£26,000

Cost by item

ItemTypical range
Sanitaryware and suite£600–£2,500
Tiling materials£25–£100 per m2
Tanking / waterproofing£250–£400
Layout change (moving WC, bath or shower)£800–£2,500
Extractor upgrade£150–£300
Trade day rate£150–£250 per day

What pushes the price up

Moving the soil pipe. Keeping the WC where it is costs a fraction of moving it. Relocating it means lifting floors, altering falls, and sometimes structural work. If you are working to a budget, this is the first thing to leave alone.

Floor build-up and joists. In older properties the joists may not carry a tiled floor and a filled bath. Strengthening work is invisible in the finished room and significant in the quote.

Tanking. Proper waterproofing in a shower or wet room costs money and is not optional. A quote that is cheaper because it skipped this is not cheaper.

Tile size and format. Large-format tiles need a flatter substrate and more preparation. Small mosaics take much longer to lay. Both cost more than a standard tile, in different ways.

Electrical work. Bathroom zoning rules restrict what goes where, and much of it is notifiable. Adding lighting or an extractor to a room with limited existing circuits can require more than expected.

Property age. Solid walls resist chasing. Old pipework often needs replacing rather than reconnecting. Lath and plaster complicates everything behind the finish.

How long it takes

5–10 days for a standard refit, longer where layout changes.

Regional differences

RegionLabour multiplier
London×1.20–1.35
South east×1.15–1.25
Midlands×1.00
North×0.85–0.95
Scotland×0.85–0.95
Wales×0.85–0.95
Applies to labour, not materials. Sources cluster on London +20-35% and North -10-15%. Damp proofing sources gave a narrower London premium of +15-25%.

How to stage the payments

Completion payment set aside, kick-off of 15-20% against the suite and tiles, then strip out and first fix, waterproofing complete and photographed, tiling, and second fix and commissioning. Hold the final 10% until the bathroom has been used for a week or two, leaks show up in use, not at handover.

Keeping the cost down

  • Leave the soil pipe where it is
  • Keep the suite standard and spend on tiling and fitting instead
  • Choose a straightforward tile format
  • Do not compromise on tanking, ever

How it works

Help your project succeed with Trusted Payments

Trusted Payments project flow: create a project, add a completion payment, manage the project in the app, pay by milestones, snagging and handover, 24-month warranty, and independent resolution if needed.
See how it works

Related guides

Where this information comes from