What Is First Fix and Second Fix?
Written by James Walker · Last reviewed 15 August 2026
James Walker has 2 degrees in construction (BSc (Hons) Building Surveying · MSc Environmental Design of Buildings) and an extensive background in issue resolution, resolving over £4 billion of consumer issues.
First fix is the work carried out before walls and floors are closed up: cables, pipes, framing and structure. Second fix is everything installed afterwards, once plastering is done, sockets, radiators, doors, sanitaryware.
Why the distinction matters
It divides almost every project into two halves with plastering between them, which makes both natural payment stages. First fix complete is something you can inspect before it disappears behind plaster. Second fix complete is close to finished.
If a builder proposes payment stages, expect these two to appear. If they do not, ask why.
What sits in each
First fix: stud walls, joists, cable runs, pipework, back boxes, waste pipes, window frames.
Second fix: sockets and switches, light fittings, radiators, taps and sanitaryware, doors and handles, skirting and architrave.
Inspecting first fix
This is the moment to look. Once plastered, changes mean cutting the wall open again. Take photographs of cable and pipe routes before they are covered, it is genuinely useful years later when someone drills a wall.
How it works